Case Studies

Real-world castable solution practices

Blast Furnace Iron Runner Precast Overhaul

Frequent iron runner relining caused long downtime. Precast trough segments and quick-change blocks cut the overhaul from 5 days to 2 days and are expected to extend runner life by over 30%.

CustomerIronmaking plant in East China (1800 m³ BF)LocationZhangjiagang, Jiangsu
View All Cases

Cement Rotary Kiln Nose Precast Protection

Frequent thermal shocks caused nose castable spalling. High-alumina/corundum precast blocks replaced cast-in-place lining, lifting life by about 40% and extending the maintenance cycle from 6 to 9 months.

CustomerCement group in Henan (5000 t/d clinker line)LocationDengfeng, Henan
View All Cases

Copper Smelter Roof Hot Repair

Local roof burn-through and cracking was repaired by hot-repair ramming plus gunning seal, cutting repair cost by about 60% and extending roof life for one more campaign.

CustomerCopper smelting company in JiangxiLocationGuixi, Jiangxi
View All Cases