Blast Furnace Iron Runner Precast Overhaul
Frequent iron runner relining caused long downtime. Precast trough segments and quick-change blocks cut the overhaul from 5 days to 2 days and are expected to extend runner life by over 30%.
Frequent thermal shocks caused nose castable spalling. High-alumina/corundum precast blocks replaced cast-in-place lining, lifting life by about 40% and extending the maintenance cycle from 6 to 9 months.
The kiln nose area suffered severe temperature swings and secondary-air erosion. Cast-in-place castable spalled and broke away within 3–4 months, forcing frequent repairs and hurting clinker output.
Blocks were designed to the kiln nose geometry using high-alumina/corundum precast units with integrated anchors, cured and pre-fired in-plant. Units were hoisted as a complete ring and joints packed with high-performance repair mix, minimising wet work on site.
Nose life improved by about 40% and the maintenance cycle extended from 6 to 9 months. On-site repair time dropped from 7 to 3 days, raising annual kiln availability.
Frequent iron runner relining caused long downtime. Precast trough segments and quick-change blocks cut the overhaul from 5 days to 2 days and are expected to extend runner life by over 30%.
Dense-phase zones suffered severe particle abrasion. A steel-fibre reinforced SiC wear-resistant lining extended the continuous run from 8 to over 12 months.
Local roof burn-through and cracking was repaired by hot-repair ramming plus gunning seal, cutting repair cost by about 60% and extending roof life for one more campaign.