Copper Smelter Roof Hot Repair

Local roof burn-through and cracking was repaired by hot-repair ramming plus gunning seal, cutting repair cost by about 60% and extending roof life for one more campaign.

CustomerCopper smelting company in JiangxiLocationGuixi, Jiangxi

1Challenge

The arched roof suffered local burn-out and cracking under hot gas and molten splashes. Full demolition was costly and time-consuming, and the customer wanted repair without a full furnace shutdown.

2Solution

The damaged zone was cleaned and re-anchored, then hot-repair ramming mix restored the geometry zone by zone, finished with a gunning material seal to reduce gas penetration while the furnace was kept warm.

3Result

Repair was completed within the scheduled maintenance window without extra downtime. Cost was about 60% lower than full rebuild, and roof life extended for one more campaign.

Related Cases

Blast Furnace Iron Runner Precast Overhaul

Frequent iron runner relining caused long downtime. Precast trough segments and quick-change blocks cut the overhaul from 5 days to 2 days and are expected to extend runner life by over 30%.

Cement Rotary Kiln Nose Precast Protection

Frequent thermal shocks caused nose castable spalling. High-alumina/corundum precast blocks replaced cast-in-place lining, lifting life by about 40% and extending the maintenance cycle from 6 to 9 months.